| 
        
         Larger 
        Image >
 
        
         Larger 
        Image >
 | 
        A six-building parish facility 
        includes the 16,000 square foot main church building that utilizes long 
        span steel framing. Other buildings in this complex include a 5,200 
        square foot wood-framed 
        Chapel and a 4,100 square foot wood-framed Pastoral Center all designed around 
        serene flower gardens and reflecting pools.
 
        Completed in 1999, this facility was the 
        recipient of San Diego AIA's highest honor, the Grand Orchid, for 
        2000. Also, the Structural Engineers Association of San Diego presented 
        it the Excellence in Structural Engineering Award for 2000. |